Work Site Tamper. WST
- Description
- Features
Track renewal train VPR-02M is designed for straightening and leveling operations for all types of repair, construction and scheduled track maintenance (with rails up to and including Р65) for all types of ballast on slopes of no more than 20 ‰. Under temperate climate conditions and ambient temperature from minus 10°С to plus 40°С with non-freezing ballast. The machine is equipped with a microprocessor leveling control system.
Technical specifications
Power plant capacity, kW |
220 |
Transmission type |
hydromechanical |
Production rate, sleepers/h |
1,400 |
Track leveling accuracy: |
|
Deviation in the longitudinal profile on the basis of 2.5 m, ‰, no more - |
1 |
Difference of rails position in level on a length of 1 m, mm, no more - |
1 |
Accuracy of track position of the path in plan view: |
|
Difference between adjacent sagging deflection measured in the middle of a 20-meter chord after 5 m, mm, no more - |
2 |
Maximum path straightening values, mm: |
|
Surfacing - |
100 |
Shifting - |
100 |
Maximum travel speed, km/h: |
|
in self-propelled mode - |
80 |
separate locomotive - |
100 |
Loaded weight, t - |
57 |